Fresh concrete looks hard within hours, but it’s not at full strength for nearly a month. Here’s the real cure timeline.
24 hours
Forms can come off most pours. Light foot traffic is OK. Don’t drive, drop weight, or place heavy objects on it.
7 days
Light vehicles can drive on it. Concrete is at roughly 70% of design strength.
28 days
Full design strength reached. Heavy vehicles, sealing, and decorative coatings can be applied safely.
Why this matters
Driving on concrete too soon — even just once — can cause invisible micro-cracking that becomes visible spider cracks years later. Waiting the 7 days is worth it.